+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published April 15, 2026agricultureexportfreight

Kostanay railway workers transported over 26.5 million tons of cargo

Теміржол көлігімен жолаушылар және жүк тасымалы. Тарифтер. Жолаушылар пойыздарының кестесі. Онлайн іздеу және билеттерге тапсырыс беру. Багажды және жануарларды тасымалдау ережелері. ҚТЖ жаңалықтары. Байланыстар.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

Kostanay railway workers transported over 26.5 million tons of cargo Over 26.5 million tons of cargo were loaded in 2024 on the network of the Kostanay freight transportation department. During the reporting period, 6,269 heavy-haul and 2,734 long trains were formed, and over 405 thousand cars were loaded.

The average daily loading volume was 1.1 thousand cars. The main types of cargo included 11.8 million tons of iron ore, 8 million tons of non-ferrous ore, 2.9 million tons of grain and 1.3 million tons of milled products. Particular attention was paid to ensuring the safety of the transported goods: in 2024, this figure was 100%, which indicates a high level of reliability and safety of transportation.

It was also possible to reduce the number of derailments on access roads by 13 incidents compared to 2023. In general, all key operational indicators of the department were met. Over 26.5 million tons of cargo were loaded in 2024 on the network of the Kostanay freight transportation department.

During the reporting period, 6,269 heavy-haul and 2,734 long trains were formed, and over 405 thousand cars were loaded. The average daily loading volume was 1.1 thousand cars. The main types of cargo included 11.8 million tons of iron ore, 8 million tons of non-ferrous ore, 2.9 million tons of grain and 1.3 million tons of milled products.

Particular attention was paid to ensuring the safety of the transported goods: in 2024, this figure was 100%, which indicates a high level of reliability and safety of transportation. It was also possible to reduce the number of derailments on access roads by 13 incidents compared to 2023.

In general, all key operational indicators of the department were met. Press service of JSC «NC«Kazakhstan Temir Zholy»

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kostanay railway workers transported over 26.5 million tons of cargo

Published source

Document: Kazakhstan Temir Zholy News · Source: Kazakhstan Temir Zholy News

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News