+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published April 13, 2026energyinfrastructurekenya

Kenya Ministry of Energy Issues Tender for Wind Measurement Infrastructure Maintenance

The Kenya Ministry of Energy published Tender No. MOEP/SDE/ONT/08/2024-2025 for rehabilitation and corrective maintenance of 27 wind masts and data loggers. The tender closed on March 12, 2025, with tender documents available from February 25, 2025.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

The Kenya Ministry of Energy published Tender No. MOEP/SDE/ONT/08/2024-2025 for rehabilitation and corrective maintenance of 27 wind masts and data loggers. The tender closed on March 12, 2025, with tender documents available from February 25, 2025.

The maintenance of 27 wind masts and associated data loggers directly affects wind resource assessment capabilities across Kenya. Wind masts provide critical anemometry data for wind farm feasibility studies, project financing, and grid integration planning. Delayed or incomplete maintenance could extend wind survey timelines, push back project development schedules, and affect energy procurement plans under Kenya's Generation Rehabilitation and Corrective Maintenance Of 27 number wind masts And data loggers Tender No MOEP/SDE/ONT/08/ 2024-2025 purity.jepkorir Wed, 03/26/2025 - 14:17 Tender Name Rehabitation & Corrective maintenance Of 27 number wind masts And data loggers Start Date Tue, 02/25/2025 - 12:00 End Date Wed, 03/12/2025 - 12:00 Download Link Tender Advert (283.2 KB) Tender document (2.1 MB) procurement roadmap. Logistics for accessing remote wind measurement sites and sourcing calibrated meteorological instruments will be required.

Sources

  • Kenya Ministry of Energy RSS
Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Rehabilitation & Corrective maintenance Of 27 number wind masts And data loggers

Published source

Document: Kenya Ministry of Energy RSS · Source: Kenya Ministry of Energy RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kenya industrial corridor and refractory demandOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Converter Water-Based Repair MaterialReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News