+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published August 25, 2026energyindustrykazakhstan

Kazakhstan Temir Zholy transports more than 19.5 million tons of coal in four months

Kazakhstan Temir Zholy (KTZ), a national railway operator of Kazakhstan, has transported more than 19.5 million tons of coal between May and August 2026 as the country prepares for the upcoming heating season, Qazinform News Agency reports, citing the company’s press service.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

Kazakhstan Temir Zholy (KTZ), a national railway operator of Kazakhstan, has transported more than 19.5 million tons of coal between May and August 2026 as the country prepares for the upcoming heating season, Qazinform News Agency reports, citing the company’s press service.

Of the total volume, 18.3 million tons were delivered to thermal power plants, while 1.2 million tons were transported for household consumption. KTZ said these figures are comparable to the volumes recorded during the same period last year. Transportation is fully supported by rolling stock.

JSC "Kaztemirtrans" operates 29,000 gondola cars, with 18,500 deployed monthly for coal transport. During peak periods, up to 3,000 additional gondola cars can be brought in. There is no shortage of rolling stock, said KTZ. Rail infrastructure is also being prepared to handle increased transportation volumes.

In 2026, track repairs are being carried out across 1,577 kilometers of railway lines, including 573 kilometers undergoing major overhauls. To boost capacity on coal routes, ongoing modernization projects are being finalized this year on the Aksu-1 - Degelen, Kyzylzhar - Zhezkazgan, and Tobol - Kandyagash sections, alongside the extension of receiving and departure tracks on the Moiynty – Zharyk section, said the company.

KTZ also highlighted modernization of the hump yard at Karaganda-Sortirovochnaya station is underway to increase its processing capacity. The heaviest demand is expected between September and November, when around 3 million tons of coal will be required, accounting for around 45% of the population’s annual demand.

Coal transportation is projected to reach 1.1 million tons in October. This will require around 520 railcars per day, nearly twice the current loading rate. Earlier, Qazinform reported Kazakhstan accumulated 4.1 million tons of coal for the heating season.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan Temir Zholy transports more than 19.5 million tons of coal in four months

Published source

Document: Qazinform English RSS · Source: Qazinform English RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News