+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published October 15, 2026economyenergyindustry

What Kazakhstan Expects to Earn From Oil in 2027

ASTANA – Kazakhstan expects to receive nearly 3.78 trillion tenge (US$7.9 billion) from oil-sector organizations for its National Fund in 2027, according to a draft national budget for 2027-2029

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA – Kazakhstan expects to receive nearly 3.78 trillion tenge (US$7.9 billion) from oil-sector organizations for its National Fund in 2027, according to a draft national budget for 2027-2029. The draft budget was approved in the first reading by deputies of the Kurultai on Oct.

14. The forecast is based on expected oil production of 96 million tons and a global oil price of $70 per barrel. The projected decline in National Fund receipts comes as Kazakhstan continues to export more oil than it did a decade ago, although production targets have been adjusted in recent years amid disruptions affecting export infrastructure.

Kazakhstan’s physical oil exports have generally increased over the past decade, rising from 63.6 million tonnes in 2015 to 65.2 million tons in 2022 and 71 million tons in 2024. Exports reached 76.3 million tons in 2025. The increase coincided with record production.

Kazakhstan produced 99.6 million tons of oil in 2025, with higher output at the Tengiz field among the factors contributing to the result. For 2026, the country initially planned to produce more oil but subsequently adjusted its target to 96 million tons, down from 98 million tons, following disruptions affecting the Caspian Pipeline Consortium (CPC), a major export route for Kazakh crude.

The projected National Fund receipts depend on several key assumptions, including production volumes, international oil prices and the exchange rate. At the budget’s assumed price of $70 per barrel, fluctuations in global oil markets could affect the amount of revenue generated by the sector.

Changes in production and export volumes could also influence the final transfers and receipts. The proposed 2027-2029 budget sets out the government’s fiscal assumptions for the coming years, including the expected contribution of the oil sector to the National Fund.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

What Kazakhstan Expects to Earn From Oil in 2027

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News