+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published May 18, 2026infrastructureinvestmentkazakhstan

Tokayev Launches Astana LRT, Becomes First Passenger on Capital’s New Rail System

Tokayev Launches Astana LRT, Becomes First Passenger on Capital’s New Rail System

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA – President Kassym-Jomart Tokayev officially launched Astana’s long-awaited Light Rail Transit (LRT) system on May 16, becoming its first passenger and marking a major milestone in the modernization of Kazakhstan’s capital and its public transportation network.

Tokayev visited the Unified Dispatch Center, which oversees and regulates public transportation in Astana, including the newly launched LRT system. According to Astana Akim (Mayor) Zhenis Kassymbek, a dedicated dispatch service for the LRT has been created, with 21 specialists responsible for monitoring and coordinating operations, the Akorda reported.

President Tokayev described the launch as an event of special importance not only for Astana but for all of Kazakhstan. He emphasized that the capital should evolve into a major Eurasian transport hub in the future and thanked the Chinese side for its role in implementing the project.

He also expressed appreciation to representatives of CTS Transportation and the Astana LRT workers involved in the construction of the system. The new 22.4-kilometer line will operate with 15 driverless trains, including four reserve units. Each train can carry more than 600 passengers.

The fully automated system controls acceleration, braking, door operations and emergency response, while manual controls and communication with dispatchers remain available for additional safety. The LRT infrastructure includes 18 stations and a modern depot. Travel time along the entire route is expected to be around 40 minutes, with trains operating at an average speed of 50-60 kilometers per hour.

Intervals between trains will range from five to six minutes. Authorities are already planning a second phase of the project to further expand public transportation in the capital. New lines are expected to connect the Astana-1 railway station, the Zhagalau residential district and the town of Koshy.

The planned extension will add 26.5 kilometers of track and 20 additional stations.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Tokayev Launches Astana LRT, Becomes First Passenger on Capital’s New Rail System

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News