+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct system
Industry update
Published April 30, 2026cementenergyinfrastructure

Power grid failures drop 15% in Kazakhstan

The 2025-2026 heating season in Kazakhstan proceeded as normal, ensuring a steady supply of heat to consumers, officials said Thursday, Qazinform News Agency reports.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article

The 2025-2026 heating season in Kazakhstan proceeded as normal, ensuring a steady supply of heat to consumers, officials said Thursday, Qazinform News Agency reports. According to Yerzhan Yertayev, Chairman of the Committee for State Energy Supervision and Control, there are positive trends: the number of technical failures at power plants dropped by 15%, and cases of non-compliance with temperature schedules decreased by two-thirds.

Kazakhstan has launched a large-scale repair campaign ahead of the next heating season. At power plants, major overhauls are planned for nine power units, 55 boilers, and 51 turbines. This year, crews are also overhauling 17,098 km of power lines, 444 substations, and over 3,400 distribution points and transformer stations.

Officials expect these efforts to reduce the average wear and tear on power grids to 65.7%. It is planned to repair or reconstruct 377 kilometers of heat distribution networks nationwide. As part of the National Project for Energy Sector Modernization, 130 km of heat networks will be rebuilt in 2026.

Together, these projects are expected to bring the average wear level of heat networks down to 48%. Energy companies have been entrusted with speeding up the bidding procedures and starting repairs immediately. Besides, they must also strictly follow hydraulic testing schedules and fix any defects found.

As Qazinform News Agency reported earlier, the World Bank confirmed reliable financing for Kazakhstan's energy infrastructure.

Next article

Sources and reading line

Official releases and public references behind the argument in this article.

Evidence line
Published source

Power grid failures drop 15% in Kazakhstan

Source: Qazinform English RSS

Open source↗
Support note

Power grid failures drop 15% in Kazakhstan

Published source

Document: Qazinform English RSS · Source: Qazinform English RSS

Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Alumina-Magnesia-Carbon BrickReview productCalcium-Magnesium-Carbon BrickReview productBasic Ramming Mass for Induction Furnace Working LiningReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News