+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published June 19, 2026economyegyptenergy

Ministers of Transport and Electricity inspect Jabal Sahaba areas in central Sinai, Ataqa in Suez

Minister of Transport Kamel El-Wazir and Minister of Electricity and Renewable Energy Dr. Mahmoud Esmat, inspect Jabal Sahaba in the Sinai Peninsula and Jabal Ataqa area in Suez

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

Minister of Transport Kamel El-Wazir and Minister of Electricity and Renewable Energy Dr. Mahmoud Esmat, inspect Jabal Sahaba in the Sinai Peninsula and Jabal Ataqa area in Suez. This tour came in line with President Abdel Fattah El-Sisi's directives to maximize returns from natural resources and to explore and study the feasibility of utilizing the Jabal Al-Sahaba area in central Sinai and Jabal Ataqah in the Suez Governorate.

The goal is to establish renewable energy projects and generate electricity from wind power. This is in light of the state's plan for sustainable development and energy transition, the national energy strategy, and the work program of the Ministry of Electricity and Renewable Energy, which aims to diversify energy sources, rely on renewable energy, and reduce the use of fossil fuels.

During the tour, the two ministers inspected a number of sites at different altitudes, as well as high-altitude sites that reach 640 meters in the Jabal Sahaba area and 870 meters in the Jabal Ataqa areas. Instantaneous wind speeds were reviewed in the field, and the geographical suitability of each site was assessed.

The visit extended to include different areas. The routes of the electricity transmission network were reviewed, and some places were selected within the framework of the plan to expand renewable energy projects and compress the timelines for implementing current projects to reach a 45% share of renewable energy in the energy mix by 2028.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Ministers of Transport and Electricity inspect Jabal Sahaba areas in central Sinai, Ataqa in Suez

Published source

Document: SIS Egypt Economy News · Source: SIS Egypt Economy News

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Africa Regional Project SupportOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Alumina-Magnesia-Carbon BrickReview productCalcium-Magnesium-Carbon BrickReview productBasic Ramming Mass for Induction Furnace Working LiningReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News