+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published April 30, 2026economyenergyinvestment

Kazakhstan, World Bank Discuss Energy Sector Modernization and Investment

ASTANA — Kazakhstan’s Energy Minister Yerlan Akkenzhenov met with Valérie Levkov, vice president for Infrastructure at the World Bank Group, to discuss expanding cooperation and financing energy sector modernization projects

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA — Kazakhstan’s Energy Minister Yerlan Akkenzhenov met with Valérie Levkov, vice president for Infrastructure at the World Bank Group, to discuss expanding cooperation and financing energy sector modernization projects. Valérie Levkov and Yerlan Akkenzhenov.

Photo credit: Energy Ministry. During the talks, the officials discussed the current state and prospects of strategic cooperation in the energy sector. The World Bank reaffirmed its role as a key partner for Kazakhstan in modernizing energy and utility infrastructure and confirmed its readiness to finance priority projects, the ministry’s press service reported on April 29.

Particular attention was given to the national project to modernize the energy and utilities sectors. In cooperation with the World Bank, roadmaps have been developed for the heat and electricity sectors across 12 utilities. These documents, based on analysis and on-site missions by international experts, focus on attracting investment, digitalization and automation.

Financing parameters, including the PforR (Program-for-Results) mechanism, are aligned with these roadmaps. The World Bank’s Regional Integration and Electricity Trade (REMIT) program in Central Asia was also discussed. The initiative aims to develop a regional electricity market and strengthen integration among countries.

Its first stage involves launching a pilot electricity market using the day-ahead model, allowing countries to trade electricity volumes without major changes to existing systems.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan, World Bank Discuss Energy Sector Modernization and Investment

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News