+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published November 12, 2026constructionenergyinvestment

Kazakhstan to Build Settlement for 33,000 Near Balkhash Nuclear Power Plant

ASTANA – Kazakhstan plans to transform the village of Ulken on the shore of Lake Balkhash into a modern settlement for up to 33,000 residents as part of preparations for the country’s nuclear power plant projects

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA – Kazakhstan plans to transform the village of Ulken on the shore of Lake Balkhash into a modern settlement for up to 33,000 residents as part of preparations for the country’s nuclear power plant projects. Photo credit: Atomic Energy Agency. Click to see the map in full size.

The map is designed by The Astana Times. The development will include housing, schools, healthcare facilities, vocational training centers and business infrastructure, Chairman of the Atomic Energy Agency Almasadam Satkaliyev said during a Nov. 12 meeting with Kazakh specialists working at Türkiye’s Akkuyu Nuclear Power Plant.

Satkaliyev stressed that the project would not create an isolated workers’ settlement but would involve the comprehensive development of the existing village, according to the agency. “This will not be a separate workers’ settlement. It will be the development of Ulken with all the supporting infrastructure necessary for living,” he said.

The plans include residential buildings, educational and medical facilities, training and retraining centers, hotels, service businesses and opportunities for entrepreneurship. Infrastructure initially built to support nuclear power plant construction could also be repurposed for the village after construction is completed.

Ulken is also expected to incorporate modern digital solutions and develop its tourism and recreational potential, leveraging its location and natural landscape along Lake Balkhash. According to Satkaliyev, construction of one nuclear power plant could require up to 15,000 workers at its peak, including civil engineers, welders, installers, electricians and automation and quality control specialists.

Almasadam Satkaliyev meets Kazakh specialists at Türkiye’s Akkuyu NPP. Photo credit: Atomic Energy Agency Once operational, each plant would employ approximately 2,000 people, including nuclear engineers, reactor operators and specialists in nuclear and radiation safety, maintenance and equipment repair.

To meet these requirements, Kazakhstan plans to establish a training center in Ulken and expand cooperation with domestic universities and specialized educational institutions in China and Russia. Kazakh citizens will also have opportunities to pursue postgraduate studies and professional internships abroad through the Bolashak international scholarship program, which provides dedicated quotas for nuclear industry training.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan to Build Settlement for 33,000 Near Balkhash Nuclear Power Plant

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Ferro-Alloy / Submerged Arc Furnace Ramming MassReview productLadle Safety Lining CastableReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News