+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published September 22, 2026businesseconomyenergy

Kazakhstan to Auction Rights to 56 Hydrocarbon Subsoil Blocks

ASTANA – Kazakhstan’s Energy Ministry will hold an electronic auction for the right to use 56 hydrocarbon subsoil blocks, with most lots offered for exploration and production as the country seeks to attract investment into its oil and gas resource base.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA – Kazakhstan’s Energy Ministry will hold an electronic auction for the right to use 56 hydrocarbon subsoil blocks, with most lots offered for exploration and production as the country seeks to attract investment into its oil and gas resource base. The auction is scheduled for Dec.

25 on the e-Qazyna platform. Applications to participate will be accepted through Nov. 18, inclusive. Most blocks are intended for geological exploration and subsequent hydrocarbon production, while four lots are designated specifically for production, Kazinform reported on Sept.

21. Most blocks are located in Kazakhstan’s western regions, including the Aktobe, Atyrau, West Kazakhstan and Mangystau Regions. The Western Ulytau block spans the Kostanai and Ulytau Regions. Block sizes vary considerably. The Tyubedzhik (Karakum) block in the Mangystau Region covers 58.95 square kilometers, while Ustyurt Block 4, also in the Mangystau Region, spans 4,058.53 square kilometers.

The Karasu block, located in the Atyrau and Aktobe Regions, covers 2,339.49 square kilometers. The upcoming auction forms part of Kazakhstan’s broader efforts to expand geological exploration and attract investment into the country’s subsoil sector. Kazakhstan has been increasingly digitizing the process, with electronic auctions and access to geological information available through the e-Qazyna infrastructure.

The electronic auction process has been fully automated since 2020, while a unified digital platform launched in 2025 further expanded online access to subsoil-use services. In March, Kazakhstan also signed a long-term geological exploration agreement with Shell Kazakhstan covering the Zhanaturmys field in the Aktobe Region, highlighting continued efforts to expand the country’s hydrocarbon resource base.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan to Auction Rights to 56 Hydrocarbon Subsoil Blocks

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News