+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published April 13, 2026energyinvestmentkazakhstan

Kazakhstan Signs €106 Million Deal for Two Single-Point Mooring Systems at CPC Novorossiysk Terminal

Kazakhstan has finalized a €106 million contract with a United Arab Emirates supplier for two single-point mooring systems destined for the Caspian Pipeline Consortium's export terminal at Novorossiysk on Russia's Black Sea coast. Officials warn the final cost may shift due to geopolitical complications affecting delivery logistics, with the contracts originally signed two years ago.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

Kazakhstan is moving forward with a major infrastructure investment at the Caspian Pipeline Consortium's terminal on Russia's Black Sea coast, securing two single-point mooring systems from a United Arab Emirates supplier at a contract value of €106 million (US$124.2 million), according to an April 9 announcement by KazMunayGas.

Yerbolat Mendybayev, director of the Department of Transportation and Logistics at KazMunayGas, disclosed the contract details on the sidelines of the Mazhilis, Kazakhstan's lower parliament house. The SPM systems will serve the CPC oil export facility at Novorossiysk, a critical gateway for Kazakh crude heading to international markets.

Contract Terms and Funding Uncertainty

Mendybayev cautioned that the signed contract price may not represent the final cost. "The currently signed contract is worth €106 million, but the price may change. The contracts were signed two years ago, and developments since then could affect the cost," he stated. The extended timeline since contract signing leaves room for adjustment as geopolitical conditions continue to evolve.

Beyond pricing concerns, delivery logistics face obstacles tied to the broader geopolitical environment. Mendybayev indicated that additional funding discussions are underway as complications emerge in transporting the equipment to Novorossiysk.

Heightened Regional Tensions

The announcement arrives against a backdrop of escalating security concerns in the Black Sea region. On April 5, a fire erupted at Russia's largest oil terminal following a drone attack, underscoring vulnerabilities at key energy infrastructure points. The incident highlights the operational risks confronting the CPC terminal, which handles a significant portion of Kazakhstan's oil exports.

The SPM systems represent a strategic upgrade for CPC's loading capabilities, enabling safer and more efficient crude transfer operations. However, the intersection of supply chain challenges and regional security threats complicates the timeline for commissioning these systems at the Novorossiysk facility.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan to Acquire Two Mooring Systems for CPC Pipeline in Novorossiysk

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Alumina-Magnesia-Carbon BrickReview productCalcium-Magnesium-Carbon BrickReview productBasic Ramming Mass for Induction Furnace Working LiningReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News