+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published November 27, 2026economyenergyinvestment

Kazakhstan’s 2027 Outlook Improves as Inflation Forecast Falls, Tenge Strengthens

Kazakhstan’s 2027 Outlook Improves as Inflation Forecast Falls, Tenge Strengthens

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA – Analysts have revised their forecasts for Kazakhstan’s inflation, exchange rate and export revenues upward, while slightly lowering expectations for economic growth this year, according to the National Bank of Kazakhstan’s November macroeconomic survey released on Nov.

26. Photo credit: Fatima Kemelova/ The Astana Times The survey, conducted on Nov. 12-18 among 15 financial, rating and research organizations, suggests a more favorable near-term economic outlook, although longer-term risks remain. Higher oil prices, slower economic growth Analysts raised their 2026 average Brent crude oil price forecast from $88.4 to $93.3 per barrel, while maintaining projections of $80 in 2027 and $75 in 2028.

Despite higher oil price expectations, Kazakhstan’s 2026 economic growth forecast was lowered from 4.8% to 4.6%. The 2027 projection remained unchanged at 4.7%, while the 2028 estimate edged up from 4.4% to 4.5%. The figures suggest that favorable oil prices may support export revenues without necessarily translating into faster economic growth.

Inflation expected to ease, Tenge outlook improves The inflation forecast for 2026 was revised downward from 9.5% to 9.1%, while the 2027 projection declined from 8.3% to 8%. Inflation is expected to reach 7% in 2028, slightly above the previous estimate of 6.9%.

Analysts also anticipate a gradual reduction in the National Bank’s base rate, from an expected 15.8% at the end of 2026 to 13.4% in 2027 and 10.8% in 2028. Meanwhile, exchange rate expectations improved across the entire forecast period. The average exchange rate is projected at 472 tenge per U.S.

dollar in 2026, compared with the previous forecast of 479 tenge. The estimates for 2027 and 2028 were revised to 489.8 and 510.4 tenge per dollar, respectively, from 499.6 and 527.1. Despite these upward revisions, analysts still expect the national currency to weaken gradually in nominal terms over the coming years.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan’s 2027 Outlook Improves as Inflation Forecast Falls, Tenge Strengthens

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News