+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published August 4, 2026businesscementdigital_infrastructure

Kazakhstan Expands Digital Water Management as Pressure on Resources Grows

ASTANA – Kazakhstan is expanding digital monitoring, flood forecasting and groundwater research as it seeks to move from reactive water management toward a system that can anticipate risks and track water supplies more accurately

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA – Kazakhstan is expanding digital monitoring, flood forecasting and groundwater research as it seeks to move from reactive water management toward a system that can anticipate risks and track water supplies more accurately. The Central Asian nation seeks to invest in better data to help solve some of its most persistent water problems.

The progress of the reforms was reviewed at an Aug. 4 meeting between Kazakh Minister of Water Resources and Irrigation Nurzhan Nurzhigitov and UNDP Resident Representative in Kazakhstan Katarzyna Wawiernia. The joint projects include an early-warning system for dams, digitization of irrigation networks, new equipment for the national hydrogeological service and a feasibility study for a reservoir in eastern Kazakhstan, reported the ministry.

A Japan-funded project is helping Kazakhstan strengthen flood protection through more coordinated dam management. The initiative includes a pilot early-warning system for dams, the integration of monitoring data into the National Water Resources Information System and the creation of a digital database of hydraulic structures.

The project has completed the design of the warning system, developed the digital database and prepared hydrodynamic models for pilot reservoirs. It has also tested flood scenarios to identify areas that could be inundated. Kazakhstan is also digitizing irrigated fields and canals across the Almaty, Zhambyl, Kyzylorda, Turkistan and Zhetisu regions to improve water accounting and management.

All agricultural fields and half of the irrigation canals in the five regions have been digitized so far. The project has also produced soil-moisture maps to support more accurate irrigation planning. Additionally, the nation has developed an early water-demand forecasting system with a digital service that allows farmers to apply for irrigation water, allocate supply limits and sign contracts electronically.

Under the first phase of a climate-resilient water resources project, regional branches of the Kazhydrogeology national hydrogeological service are receiving modern equipment to improve groundwater research. The planned purchases include a groundwater detector, a mobile field laboratory and a drilling rig.

The Kazakh Research Institute of Water Management in Taraz will also receive new machinery and equipment. Sixty-six units are expected to be purchased. Under a tripartite agreement between UNDP, the Water Resources and Irrigation Ministry and the Eurasian Development Bank, a regional training center for farmers is being developed in the Turkistan Region to promote water-saving irrigation technologies.

The partners are discussing the format of the center’s training programs and practical sessions. UNDP is also preparing a feasibility study for a reservoir on the Kenderlik River in the East Kazakhstan Region as part of a broader program to support sustainable irrigation and related business development.

Kazakhstan and UNDP are also launching a new Global Environment Facility-supported program to improve ecosystem management in the Kazakh section of the Caspian Sea and surrounding areas. The initiative will include ecosystem mapping, spatial planning, biodiversity monitoring and the restoration of degraded land.

It will also address marine pollution and litter by improving waste-management systems and testing new solutions in coastal communities. Although progress has been made, Kazakhstan continues to face mounting water security challenges, including from agricultural demand.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan Expands Digital Water Management as Pressure on Resources Grows

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Alumina-Magnesia-Carbon BrickReview productCalcium-Magnesium-Carbon BrickReview productBasic Ramming Mass for Induction Furnace Working LiningReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News