+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published July 17, 2026businesscementeconomy

Kazakhstan and Azerbaijan to build intermodal terminal at Port of Alat

A joint Kazakh-Azerbaijani intermodal terminal is set to be constructed at the Port of Alat. This was announced during a meeting between the Ambassador of Kazakhstan to Azerbaijan, Alim Bayel, and the Executive Director of the Azerbaijan Transport and Communication (AZCON) Holding, Shahin Babayev, Qazinform News Agency correspondent in Baku reports.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article

A joint Kazakh-Azerbaijani intermodal terminal is set to be constructed at the Port of Alat. This was announced during a meeting between the Ambassador of Kazakhstan to Azerbaijan, Alim Bayel, and the Executive Director of the Azerbaijan Transport and Communication (AZCON) Holding, Shahin Babayev, Qazinform News Agency correspondent in Baku reports.

The sides discussed the current state and prospects of transport and logistics cooperation between the two nations, alongside ways to expand transport connectivity and boost the handling capacity of the Trans-Caspian International Transport Route (Middle Corridor).

During the meeting, the Kazakh Ambassador recalled that an agreement to construct the joint intermodal terminal at the Port of Alat was reached in 2024 in the presence of the two countries' heads of state. The Azerbaijani side was informed that the Baku Port master development plan is in its final stages of updating, after which construction of the terminal is expected to commence.

Special emphasis was placed on implementing agreements on mutual supplies of transport machinery. Kazakhstan intends to purchase vessels built in Azerbaijan, while Azerbaijan will continue to acquire locomotives manufactured in Kazakhstan. As part of this agreement, Kazakhstan has already placed an order with the Baku Shipyard for the construction of two dry cargo vessels.

Earlier, Azerbaijani President Ilham Aliyev highlighted Kazakhstan’s strategic role in bilateral projects.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Kazakhstan and Azerbaijan to build intermodal terminal at Port of Alat

Published source

Document: Qazinform English RSS · Source: Qazinform English RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Alumina-Magnesia-Carbon BrickReview productCalcium-Magnesium-Carbon BrickReview productBasic Ramming Mass for Induction Furnace Working LiningReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News