+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published June 8, 2026egyptenergyindustry

El-Gharably commissions steel structures complex in Alexandria

Egyptian Prime Minister Mostafa Madbouly inaugurated the first phase of the El-Gharably Industrial Complex for integrated engineering and steel structures in New Borg El-Arab City, Alexandria.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article

Egyptian Prime Minister Mostafa Madbouly inaugurated the first phase of the El-Gharably Industrial Complex for integrated engineering and steel structures in New Borg El-Arab City, Alexandria. The complex covers an area of 315,000 square meters and has an annual production capacity exceeding 100,000 tons of steel structures.

The facility is designed to support major infrastructure, industrial, transport, and energy projects across Egypt. According to the company, the first phase includes a steel structures plant spanning 100,000 square meters with annual capacity exceeding 100,000 tons.

The facility supplies steel structures for national projects including the Decent Life initiative, Abu Qir New City, and the West Arc Axis. The first phase also includes a 50,000-square-meter maintenance and engine overhaul workshop complex, capable of carrying out 20 engine overhauls, 10 complete renewals, and 40 general repairs per month.

In addition, an industrial and medical gases plant with a production capacity of 550 cylinders per day has been established. The project currently employs around 3,000 workers, with plans to increase the workforce to 5,000. The company said it relies heavily on locally sourced steel and is developing partnerships with international companies to support technology transfer and export growth.

As part of the second phase, El-Gharably is studying a partnership with Turkey’s Erciyas to establish a spiral welded pipe manufacturing facility with annual production capacity of 50,000 tons, with around half of the output targeted for export. Other planned projects include railway wagon and agricultural machinery manufacturing facilities in cooperation with Polish partners.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

El-Gharably commissions steel structures complex in Alexandria

Published source

Document: Mesteel Egypt Steel News · Source: Mesteel Egypt Steel News

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Africa Regional Project SupportOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Alumina-Magnesia-Carbon BrickReview productCalcium-Magnesium-Carbon BrickReview productBasic Ramming Mass for Induction Furnace Working LiningReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News