+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published June 23, 2026energyinfrastructureinternational_finance

EBRD Backs Key Road Upgrade to Strengthen Middle Corridor

ASTANA — The European Bank for Reconstruction and Development (EBRD) is providing a loan of up to 230 million euros (US$262.3 million) in Japanese yen equivalent to help complete the modernization of a key road section in western Kazakhstan, supporting the development of the Trans-Caspian Corridor, the EU’s Global Gateway flagship initiative.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA — The European Bank for Reconstruction and Development (EBRD) is providing a loan of up to 230 million euros (US$262.3 million) in Japanese yen equivalent to help complete the modernization of a key road section in western Kazakhstan, supporting the development of the Trans-Caspian Corridor, the EU’s Global Gateway flagship initiative.

EBRD has invested nearly $12.8 billion in Kazakhstan through 354 projects. Photo credit: EBRD The financing will enable Kazakhstan’s state-owned road operator QazAutoZhol to complete upgrades to a 234-kilometer stretch between Aktobe and Ulgaisyn. The loan forms the second part of the EBRD’s financing package for the project, following initial funding in 2025, and is co-financed by the Asian Infrastructure Investment Bank (AIIB).

The project will convert the existing category II single-carriageway road into a category I dual-carriageway highway. The route is part of the Western Europe-Western China Corridor, CAREC Corridor 1 and European Route E38, strengthening Kazakhstan’s role as a transport gateway between Europe and Asia, reported the bank’s press service on June 23.

The road will be equipped with intelligent transport systems, including e-tolling, weigh-in-motion sensors and weather-monitoring technology to improve safety and traffic management. As part of their broader cooperation, Kazakhstan’s Transport Ministry and the EBRD also agreed to advance the digitalization of the road sector through the E-Joldar road asset management platform and intelligent road control solutions.

To date, the EBRD has invested nearly $12.8 billion in Kazakhstan through 354 projects, making it the bank’s largest and longest-running investment destination in Central Asia.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

EBRD Backs Key Road Upgrade to Strengthen Middle Corridor

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News