+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published October 12, 2026cementeconomyenergy

Can Middle Corridor Deliver on Its Promise?

ASTANA – The Trans-Caspian International Transport Route (TITR), widely known as the Middle Corridor, has evolved from a regional transport initiative into a strategic Eurasian trade route

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA – The Trans-Caspian International Transport Route (TITR), widely known as the Middle Corridor, has evolved from a regional transport initiative into a strategic Eurasian trade route. Its long-term success, however, will depend on whether Kazakhstan and its partners can turn infrastructure investment and political momentum into a reliable, commercially viable and integrated logistics network.

The TITR is a multimodal route connecting China and Central Asia with the Caspian Sea, the South Caucasus, Türkiye and European markets. Cargo traveling west from China crosses Kazakhstan by rail, reaches the Caspian ports of Aktau or Kuryk, continues by sea to Azerbaijan and then moves through Georgia and Türkiye.

The route began taking shape in 2013-2014, when Kazakhstan, Azerbaijan and Georgia established a coordination mechanism to develop it. The TITR International Association was established in 2017 to strengthen competitiveness, develop infrastructure, reduce administrative barriers and coordinate transport processes and tariffs.

Renewed demand for alternative Eurasian supply chains, combined with investment in railway and port infrastructure, has accelerated the corridor’s development. “The Middle Corridor is really maturing politically faster than it is maturing operationally,” said Assylbek Nurgabdeshov, assistant professor of strategy and director of Strategy Postgraduate Programs at Edinburgh Business School, Heriot-Watt University, during a Sept.

15 webinar on the corridor. The question is now whether the route can become reliable enough for companies to build long-term supply chains around it. Cargo volumes demonstrate growing demand. According to Kazakhstan’s official data, freight volumes along the TITR reached 2.76 million tons in 2023, up 65% from 1.7 million tons in 2022.

In 2024, the volume increased to 4.5 million tons, up 62% year on year, while container traffic grew 2.7 times to 56,500 twenty-foot equivalent units (TEU). In 2025, freight volumes stood at 4.1 million tons, down 8.9% from 2024, while container traffic increased 36% to 77,000 TEU.

The figures show that while total freight volume declined slightly in 2025, container traffic continued to grow, suggesting a shift in the composition of cargo moving along the route. Kazakhstan’s Ministry of Transport puts the corridor’s capacity at around six million tons and up to 182,000 containers annually.

Kazakhstan expands the physical backbone Kazakhstan occupies a central position because cargo traveling between China and the Caspian Sea must cross its territory. The country is therefore investing across the transport chain. At Kuryk, berth modernization is under way, alongside the Sarzha grain terminal being developed with Abu Dhabi Ports and the Ersai container terminal.

At Aktau, the container hub developed with China’s Lianyungang Port is complete.

Next article

Sources and reading line

Public reports, policy documents, and industry releases cited in this article remain available here for continued review.

View cited sources1 sources

Can Middle Corridor Deliver on Its Promise?

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Open source↗
Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Related product systems

Continue into the product systems that are most likely to appear in the same procurement discussion.

Alumina-Magnesia-Carbon BrickReview productCalcium-Magnesium-Carbon BrickReview productBasic Ramming Mass for Induction Furnace Working LiningReview product
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News