+86-156-2511-0166[email protected]WhatsApp
Hanheng Refractory
HOMEABOUT
PRODUCTS
All products
APPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
Hanheng Refractory
HOMEABOUTAPPLICATIONS & INDUSTRIESMARKET SUPPORTNEWS
DISCUSS
+86-156-2511-0166WhatsApp[email protected]
Hanheng RefractoryHanheng RefractoryBuilt for heat. Proven in delivery.

Hanheng Refractory Materials Co., Ltd. supplies shaped bricks, monolithic refractories, tundish materials, and insulation products for steel, ferroalloy, glass, boiler, and other heat-intensive operations.

Quick links

  • Home
  • About
  • Products
  • Applications & Industries
  • Market Support
  • News

Core products

  • Magnesia-Carbon Brick
  • Alumina-Magnesia-Carbon Brick
  • Magnesia-Alumina-Carbon Brick
  • Al2O3-SiC-C Brick
  • Calcium-Magnesium-Carbon Brick

Contact

Panpan Road, Zhanqian District, Yingkou, Liaoning, Chinawww.hanhengref.com[email protected]+86-156-2511-0166WhatsApp

© 2026 Hanheng Refractory

Project discussionProduct systemPrivacy Policy
Industry update
Published May 6, 2026businessenergykazakhstan

Almaty Launches Low-Emission Zone Pilot to Test Air Quality Systems

ASTANA — A pilot low-emission zone (LEZ) was launched in Almaty on April 28 to test digital infrastructure and assess how traffic affects air quality, without introducing restrictions for drivers, the city’s akimat (administration) reported.

Source-backed market reading focused on the local industrial developments, project signals, and operating consequences that are actually worth tracking.

Read Article
Previous article

ASTANA — A pilot low-emission zone (LEZ) was launched in Almaty on April 28 to test digital infrastructure and assess how traffic affects air quality, without introducing restrictions for drivers, the city’s akimat (administration) reported. Photo credit: Almaty Akimat (administration).

The test area covers a central block bordered by Bogenbay Batyr Street, Abai Avenue, Zheltoksan Street, and Dostyk Avenue, with Almaty Parking serving as the project operator. At this stage, the system is operating in test mode, meaning there are no traffic restrictions, fines, or entry fees.

The primary goal is to evaluate the performance of digital infrastructure and collect data on traffic flows and their impact on air quality. The project involves testing smart cameras, radar sensors, and automated vehicle recognition systems under real-world conditions, while also synchronizing traffic data with air quality sensors to better understand environmental impacts.

It also focuses on establishing secure data exchange between IT systems, environmental experts, and traffic management services, forming the basis of a unified digital platform. The collected data will support in-depth urban mobility analysis and help shape future smart city strategies.

Officials emphasized that at this stage, the focus is not on introducing restrictions, but on verifying data accuracy, the speed of data exchange, and the readiness of the infrastructure. The pilot phase will continue until Dec. 31, with traffic operating as usual throughout the test period.

Next article

Sources and reading line

Official releases and public references behind the argument in this article.

Evidence line
Published source

Almaty Launches Low-Emission Zone Pilot to Test Air Quality Systems

Source: Astana Times RSS

Open source↗
Support note

Almaty Launches Low-Emission Zone Pilot to Test Air Quality Systems

Published source

Document: Astana Times RSS · Source: Astana Times RSS

Continue from here

Continue this article into market review, product systems, and project preparation.

When this signal is already affecting your buying sequence, continue from here into the related market page, product route, or a practical project discussion.

Related market pages

Continue into the country page when destination documents, packing, and delivery timing need a deeper read.

Kazakhstan industry and refractory demandOpen market page
Project preparation

Share the unit, duty position, target campaign, destination market, and document questions so the next reply can stay practical.

Unit name, exact hot-zone position, and current lining route

Target campaign, shutdown or commissioning window, and expected quantity split

Destination market, delivery route, and the document set needed before quotation

Discuss this articleBack to News